Generation type: Solar PV + Battery Energy Storage System
Location (region):
Zakarpattia Region
Capacity:
- Installed capacity 69.5 MW DC / 49.8 MW AC
- BESS 48 MW / 160 MWh
- Grid connection capacity 50 MW
Project stage:
Ready-to-Build (RTB)
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Budzhak, Odesa Region
Capacity:
- Installed capacity 30.86 MW DC / 24.0 MW AC
- BESS 20 MW / 90.27 MWh
- Grid connection capacity 31.8 MW
Project stage:
Ready-to-Build (RTB)
Generation type: Biomethane, two-stage anaerobic digestion
Location (region):
Kovel District, Volyn Region
Capacity:
- Equivalent capacity 7.2 MW
- Biomethane output 6.36 million Nm³/year
Project stage:
Ready-to-Build (RTB)
Generation type: Cogeneration (Combined Heat and Power)
Location (region):
Kharkiv Region
Capacity:
- 195.6 MW electric / 200 MW thermal
- Grid connection 110 kV (Stepova 330/110/10 kV substation)
Project stage:
Ready-to-Build (RTB)
Generation type: RDF Waste-to-Energy / CHP
Location (region):
Kamianets-Podilskyi, Khmelnytskyi Region
Capacity:
- 25 MW electric / 27 MW thermal
Project stage:
Under consideration
Generation type: Cogeneration (Combined Heat and Power)
Location (region):
Zlatopil, Kharkiv Region
Capacity:
- 70 MW electric / 70 MW thermal
- Grid connection capacity 70 MW
Project stage:
Under consideration
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Trikhaty village, Mykolaiv Region
Capacity:
- Installed capacity 9.9 MW DC / 8.4 MW AC
- BESS 5 MW / 20 MWh
- Grid connection capacity 8.4 MW
Project stage:
Under consideration
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Novohryhorivka village, Mykolaiv Region
Capacity:
- Installed capacity 30.0 MW
- BESS 30 MW / 120 MWh
- Grid connection capacity 30.0 MW
Project stage:
Under consideration
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Prybuzhany village, Mykolaiv Region
Capacity:
- Installed capacity 33.9 MW
- BESS 33 MW / 110 MWh
- Grid connection capacity 34.0 MW
Project stage:
Under consideration
Generation type: Wind + Floating Solar PV + BESS
Location (region):
Dnipro, Kirovohrad and Mykolaiv Regions
Capacity:
- Wind 297.6 MW
- Floating solar PV 300 MW
- BESS 300 MW / 1,200 MWh
- Grid connection to two 330 kV substations
Project stage:
Greenfield
Generation type: Small Modular Reactor (SMR, PWR technology)
Location (region):
To be determined
Capacity:
- To be determined (DAVID SMR module: 170 MWt / 50 MWe)
Project stage:
Greenfield, conceptual stage (LOD 100)
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Smila District, Cherkasy Region
Capacity:
- Installed capacity 21.2 MW DC / 15.9 MW AC
- BESS 15 MW / 50 MWh
- Grid connection capacity 15.9 MW
Project stage:
Under consideration
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Talne District, Cherkasy Region
Capacity:
- Installed capacity 6.7 MW DC / 5.0 MW AC
- Integrated BESS (capacity to be confirmed)
- Grid connection capacity 4.3 MW
Project stage:
Under consideration
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Cherkasy Region
Capacity:
- Installed capacity 10.45 MW DC / 8.40 MW AC
- BESS 6 MW / 20 MWh
- Grid connection capacity 8.4 MW
Project stage:
Under consideration
Generation type: Biomethane, two-stage anaerobic digestion
Location (region):
Voronkivtsi, Khmelnytskyi Region
Capacity:
- Equivalent capacity 3.2 MW
- Biomethane output 2.79 million Nm³/year
- CHP unit 0.69 MW
Project stage:
Ready-to-Build (RTB)
Generation type: Battery Energy Storage System + Solar PV
Location (region):
Borodianka, Kyiv Region
Capacity:
- BESS 200 MW
- Solar PV 28.8 MW AC / 41.9 MW DC
- Grid connection 330 kV
Project stage:
Ready-to-Build (RTB)
Generation type: Hybrid: Onshore Wind + Solar PV + BESS
Location (region):
Zhytomyr city, Zhytomyr Region
Capacity:
- Wind 79.8 MW
- Solar PV 37.8 MW
- BESS 44 MW / 176 MWh
- Grid connection capacity 86.8 MW
Project stage:
Ready-to-Build (RTB)
Generation type: Solar PV + Battery Energy Storage System
Location (region):
Smila District, Cherkasy Region
Capacity:
- Installed capacity 12.0 MW DC / 9.0 MW AC
- BESS 9 MW / 30 MWh
- Grid connection capacity 9.0 MW
Project stage:
Under consideration
ELQ Investments is an institutional-grade investment and development platform dedicated to the structural reconstruction and modernization of Ukraine’s energy sector. Our strategic mandate is to reinforce Ukraine’s energy security and resilience by deploying scalable, standardized, and diversified infrastructure projects.
We do not operate as a collection of isolated assets; instead, we have engineered an integrated energy ecosystem designed for centralized capitalization. By combining near-term execution readiness with EU-aligned governance, we provide a definitive entry point for international capital to drive Ukraine’s long-term integration with the European energy market.
The Ukrainian energy market faces a structural generation deficit of approximately 6 GW during peak demand periods, with total sector reconstruction needs estimated at USD 90.6 billion. This systemic crisis demands a fundamental shift from legacy infrastructure to a decentralized, resilient generation model. The scale of capital required cannot be met by public funding alone, creating an urgent need for private institutional capital capable of navigating geopolitical realities while bridging the gap to European energy market integration.
ELQ Investments presents a strategic window for infrastructure investors, offering corporate-level entry into a pre-assembled, scalable energy ecosystem. By combining private capital allocation with institutional-grade governance, ring-fenced SPVs, and ESG compliance, the platform effectively mitigates execution risks. This structure provides a clear, de-risked pathway for international capital, development finance institutions (DFIs), and strategic partners to participate in Ukraine’s energy transition and capitalize on its progressive ENTSO-E synchronization.
Beyond delivering an attractive financial profile, the ELQ Investments ecosystem is engineered to generate a systemic, macro-level impact. The deployment of diversified renewable, biomethane, and cogeneration assets directly addresses the national power deficit and establishes long-term energy security. Furthermore, the platform drives the structural decarbonization of the region, delivering estimated CO₂ savings of 2.1 million tons annually. This transition to operational infrastructure acts as a fundamental catalyst for Ukraine’s post-war macroeconomic stabilization.
The ELQ Investments portfolio is engineered as an integrated, corporate-level infrastructure platform rather than a collection of isolated assets. This institutional framework offers immediate execution readiness through 9 projects in progress, including 7 Ready-to-Build (RTB) projects with approximately 604.5 MW of baseline capacity, and 9 projects under consideration. With a broader ecosystem scale of over 1.4 GW across multiple complementary technologies, the platform is structurally positioned to bridge Ukraine’s immediate generation deficit while establishing a bankable, future-ready energy asset base aligned with the European market.